Before you buy or rent in Paje, it helps to know how the internet, the power supply and the water work.
The short answer
The internet is good enough for remote work. In Q2 2026, download speeds in Tanzania averaged 31.77 Mbps on fixed broadband and 14.26 Mbps on mobile networks. Zanlink lists Paje among the areas it covers, on a network that combines a fibre ring with 4G WiMAX, and its free site survey settles the best connection for an address. A fibre line at home, with a mobile data plan as backup, is the set-up to look for.
Power is the utility to plan around. In February 2026, Unguja, Zanzibar's main island, received 135.7 MW of electricity against a demand of 165 MW, a deficit of about 30 MW. When demand runs ahead of supply, the utility switches off power to some areas in turn, which is called load-shedding. In March 2026, The Citizen described Zanzibar's electricity outages as persistent, and that month the government committed TZS 800 billion to upgrade the power infrastructure, expecting the outages to be resolved by 2028. When you view an apartment, ask three things: what backup power it has, which connection a provider can install at the address, and whether each apartment has its own meters.
Most of the island's water comes from underground. Vela Breeze's own power and water systems are set out under "How Vela Breeze is set up" below.
Internet, fibre, mobile data and satellite
For a home in Paje, fibre is the connection to ask for. Zanlink, one of the island's providers, says it covers Zanzibar, including Stone Town, Paje, Nungwi, Kendwa, Jambiani, and Bwejuu. Its network combines an island-wide fibre ring with a 4G WiMAX radio network. Zanlink offers a free site survey before it connects a home. Cable broadband normally takes a day to install, and a radio (microwave) connection not more than two days. Zanlink's service is prepaid. If you miss a payment deadline, you automatically lose your connection, so it is worth renewing before a trip.
Other providers also offer home broadband. Halotel, one of the national mobile operators, lists Zanzibar among the regions its HaloFiber service reaches. On 26 November 2026, Halotel listed home fibre plans from TZS 55,000 a month for 60 Mbps to TZS 220,000 a month for 300 Mbps, with free installation. ZanNet, a broadband provider based at Pongwe, also serves the island.
Mobile data is the everyday backup. In June 2026, four operators accounted for most mobile subscriptions in Tanzania. Vodacom had 33.0%, Yas 28.6%, Airtel 20.5%, and Halotel 16.4%. Tanzania registers SIM cards biometrically, and a visitor registers with a passport. On 24 November 2026, Halotel's 30-day data bundles started at TZS 10,000 for 4.8 GB. With a generous data plan, you can share your phone's mobile data connection with another device if the Wi-Fi goes down.
Across Tanzania in Q2 2026, mobile networks averaged 14.26 Mbps for downloads, with a response delay (latency) of 76.79 ms. Fixed broadband averaged 31.77 Mbps for downloads and 26.67 Mbps for uploads, with a latency of 15.67 ms. 5G reached 34.18% of Tanzania's population that June.
Starlink is not available in Tanzania yet. Starlink applied for a Tanzanian licence in November 2024 and was still waiting for approval in September 2026. On 26 November 2026, Starlink's own availability data listed Tanzania as coming soon, with service expected to start in 2026.
Our July 2026 technical specification for Vela Breeze calls for internet and TV cabling in the building.
Power, the grid and why it goes out
Zanzibar receives its electricity from mainland Tanzania through undersea cables. Two cables supplied by the mainland utility, Tanesco, carry electricity to Unguja. The 45 MW line was installed in 1980, and the 100 MW line was laid later. Both cables are operating close to their maximum transmission capacity. In March 2026, the 45 MW cable operated at 98.8% of capacity and the 100 MW cable at 97.3%.
The island has grown faster than its grid. Economic growth, a rising population, and new housing have put extra strain on the distribution network, so the utility uses load-shedding in some areas to keep the system from failing. Authorities issue public notices to inform residents about power interruptions.
Grid upgrades are under way, and Unguja has tackled blackouts with a new cable before. The 100 MW cable came from a programme of the US Millennium Challenge Corporation (MCC), which ran from 2008 to 2013 to address frequent blackouts on Unguja. MCC's 2015 evaluation of hotels on Unguja found that voltage fluctuations and outages fell significantly after the 100 MW cable came into service.
The current round is larger. In March 2026 the government committed TZS 800 billion to upgrade Zanzibar's power infrastructure. The Zanzibar Electricity Corporation (ZECO) signed a $159 million contract to replace about 1,000 km of power lines. A new undersea cable able to carry 270 MW is planned. Projects financed by the World Bank and the African Development Bank are part of the same effort. Our own market research records $500 million committed to roads, utilities, and airport upgrades in Zanzibar.
Extra generation is bridging the gap between supply and demand while the new lines are built. In February 2026 ZECO activated 30 generators expected to add 20 MW. A temporary power-generation vessel supplies electricity for eight months to a year as an interim measure. The government expects the outages to be resolved by 2028, when the projects are completed.
Water, where it comes from in the south-east
Groundwater is Zanzibar's major water source, and the island's dependence on it is more than 95%. In the south-east of Unguja, groundwater comes from a freshwater lens: a layer of fresh water underground that sits over deep-lying seawater. Pumping too much fresh water from the lens draws salt water into it. This process, called seawater intrusion, has occurred in Zanzibar because of uncontrolled pumping.
A building can also make its own fresh water. Desalination, which turns salt or brackish water into fresh water, is expensive and uses a lot of energy.
The public network in the south is growing. In August 2026 a new water project opened at Kizimkazi, in the South Unguja region, with a one-million-litre storage tank and a source able to produce 2.4 million litres a day.
Our July 2026 technical specification for Vela Breeze sets out that water is to come from our private network. The network includes a desalination and filtration station, a tank, and an on-site pumping station to maintain water pressure.
What to check when you view an apartment
A viewing is the moment to ask how the building handles each utility. These are the questions we would ask ourselves:
- Power: when you look at a home, ask what backup power it has, and confirm that it has a generator.
- Internet: ask which providers already serve the building, and ask a provider for a site survey at the address. Zanlink offers one free.
- Water: ask where the water comes from, whether it is treated on site, and how much storage the building has.
- Meters: ask whether each apartment has its own meters for electricity and water, so you pay only for what you use.
- Billing: ask how each bill is paid. Zanlink, for example, issues invoices in US dollars and accepts payment in shillings at the day's exchange rate.
How Vela Breeze is set up
We designed Vela Breeze so that the utilities are part of the building, not an afterthought. The development includes a generator, solar panels, a desalination system, and a water tank.
Under our July 2026 technical specification, the buildings will use power from the local grid and solar panels, with a generator for emergencies. We expect the solar panels to cover about 30% of total power consumption. The actual share depends on the occupancy rate and the weather at any given time.
Energy use is kept down by the design itself. The buildings have no European energy label, but they are built with a focus on sustainability: solar panels, batteries, natural ventilation, and energy-efficient air conditioning. Both of our complexes are oriented to Zanzibar's prevailing trade winds, with deep balconies and window placement that reduce the need for mechanical cooling.
Each apartment is to have its own water and electricity meters.
What utilities cost
The bills depend on how you live. We cannot predict monthly electricity, water, and internet costs by apartment type. Our owners use these services differently and pay for what they consume.
Electricity is billed at a regulated tariff. Under the ZECO tariff in force since 20 January 2025, ordinary domestic customers pay TZS 2,100 a month plus TZS 280 per kilowatt-hour (kWh) for usage up to 1,500 kWh.
For internet prices, see the Halotel home fibre prices we read on 26 November 2026, in the internet section above. Our guide to the cost of living in Zanzibar shows how these costs fit into a full monthly budget, and the true cost of owning a Zanzibar apartment covers the yearly running costs. For daily life beyond the utilities, read our guides to living in Zanzibar as an expat, working remotely from Zanzibar, and Paje, the village and the beach.
To see how the building handles power and water, look at the Vela Breeze amenities, or ask our sales team.